Page 87 - Gulipek Sustainability Report 2021
P. 87
AINAB
ILIT
DYEING FACTORY - Project11 2021 SUST
HOT AIR LINE R
Y REPO
T
Projected Date:2021
Actions: There are two RAM machines in the dyeing
factory. A hot air line was run from the first RAM
machine’s filter to the second RAM machine.
Outcomes
Environmental:
• 36,2% Energy savings
Financial:
• Reducing energy cost
DYEING FACTORY - Project12
HOT WATER LINE
Projected Date:2022
Actions: The hot water line from one of the RAM machines found in the dye factory’s filter will be
connected to the heat recovery system.
Outcomes
Environmental:
• Energy savings
• Water savings
Financial:
• Reducing energy cost
85