              PROJECT
                11         Dyehouse factory - Energy Study Report

                           Target Date : 2022
                           Actions: Production volume in the Dyehouse factory’s dyeing and finishing activities increased,
                           and energy consultancy services were initiated in order to monitor and reduce energy consump-
                           tion in a healthy way. Following the visits, an energy audit report was prepared with an energy
                           manager at our factory. In 2023, it is planned to employ a full-time Energy Manager at our Dye-
                           house Factory.
                           Results:
                           Environmental:
                           • Identification of projects to reduce energy use
                           Economical:
                           • Energy saving projects and determination of amortization periods
                           • Reducing energy costs






              PROJECT
                12         Dyehouse factory - Scada System

                           Target Date : 2022

                           Actions: In order to increase the traceability of electricity, water, and natural gas consumed du-
                           ring production activities in the paint factory, all machines were made compatible with the Scada
                           system in the report year. All consumption is monitored with an online monitoring screen.
                           Results:
                           Environmental:
                           • Traceability of water and energy consumption amounts on machine basis
                           Economical:
                           • Traceability of water and energy consumption
                           costs on machine basis









              PROJECT
                13         Dyehouse factory - Hot Water Line

                           Target Date : 2022
                           Actions: The hot water line from the filter of one of the RAM machines identified in the dyehouse
                           factory was connected to the heat recovery system.
                           Results:
                           Environmental:
                           • Energy Saving
                           • Water saving
                           Economical:
                           • Reducing energy costs







                                                                                     GRI 2-24, GRI 3-3, GRI 302-4, GRI 302-5  107